STEM LAB FEASIBILITY STUDY | BARBERMCMURRY ARCHITECTS

SECTOR: Education
TYPE: New construction
BUILDING AREA: 105,000SF new construction
CURRENT PHASE/ESTIMATED COMPLETION: On hold
ROLE: Conducted a feasibility study and produced marketing materials for a future advanced STEM lab. Responsibilities included developing the program and program floorplans, preliminary site analysis and design, conducting client meetings, conducting precedent activities with current students, and compiling marketing/presentation documents.

The proposed two-story STEM lab would be a shining star of STEM education in the local school system and all of East Tennessee. A facility of this nature would allow for a deeper dive into these areas of study and an increased emphasis on preparing students for careers in the STEM fields. Beyond the academic calendar, the facility would also provide opportunities for annual STEM conferences, AP Summer Institute Educator Training, KMA summer programming, and collaborative events with regional research laboratories

Previous
Previous

VIOLINMAKER'S STUDIO

Next
Next

SEQUOYAH HILLS HOME